By Bob Swor, November 2019
Category: Electrical
View/Navion Power Systems – Major Components
Prepared by Edwin E. Irving (eeirving@gmail.com)
September 2, 2010
Revised 9/19/10
Revised 3/22/12
Revised 5/8/12
Revised 5/27/12
Acknowledgements:
I want to thank Elden DuRand for preparing the CAD drawing which is part of this description and for helping me to better understand operation of the major components. Thanks too to Byron for his patient responses to my questions requiring detailed explanations of the electrical component operations. I also derived editorial information from Capt. “Ed” and Ed Von Gehr; and from others who have added helpful input during the many discussions of this subject over the years. Introduction: Read more “View/Navion Power Systems – Major Components”
Installing GC2 (Golf Cart 6 Volt) Batteries in Views and Navions
Installing GC2 (Golf Cart 6 Volt) Batteries in Views and Navions
- Disconnect batteries using disconnect switch
- Remove the ground Cable off the existing batteries.
- Remove the remaining cables
- Remove the Batteries
- You will need one of the short jumpers that went between the two batteries (red)
Installing new batteries: Read more “Installing GC2 (Golf Cart 6 Volt) Batteries in Views and Navions”